Crane Mats & Steel Road Plates temporary road
Our customer carried out drilling work as part of the ground investigation for the Amprion underground cable route from northern Germany to the Ruhr area. We supported the road construction in the area between Freiburg (Elbe) and Hemmor with 680 crane mats and 50 steel road plates. By repeatedly moving the plates from drilling point to drilling point, we laid a total distance of 3.2 km and supported 14 drilling points.